Skip to content

How much does an exhibition stand cost in Dubai and Riyadh?

Illustration for How much does an exhibition stand cost in Dubai and Riyadh?

Exhibitors usually ask for a price per square metre. It is a reasonable question with an unhelpful answer, because two stands of the same size can differ several times over in cost. This guide gives indicative ranges so you can set a budget, then explains what moves the number.

Indicative cost per square metre in Dubai

The ranges below are indicative market figures for Dubai, taken from a published stand-builder guide in late 2026, and are shown here only to help you set a first budget. Exhibix Gulf quotes every project individually; replace these with the itemised figures in your quotation.

Stand typeIndicative AED per sqmTypical lead time
Shell-scheme upgrade800 – 1,2002 – 3 weeks
Modular system stand1,200 – 2,2003 – 5 weeks
Custom-built stand2,200 – 4,0006 – 10 weeks
Premium island stand4,000 – 6,50010 – 16 weeks
Double-deck stand5,000 – 8,500+12 – 18 weeks

So a 36 sqm custom stand in Dubai is likely to land somewhere between AED 80,000 and AED 145,000 before organiser charges, while a modular stand of the same size might cost AED 45,000 to 80,000. These are planning figures, not quotations.

What about Riyadh and Saudi Arabia?

Saudi stands are priced on the same drivers. Expect similar per-square-metre bands in SAR, with two local differences: transport distance adds cost when elements are produced outside the city, and the largest Riyadh shows (LEAP, Cityscape Global) fill regional production capacity in the weeks before they open, so late briefs cost more. Many Riyadh stands also include majlis-style hospitality areas and large LED, which push a project into the upper bands.

The seven things that move the price

1. Stand type

A shell-scheme upgrade, a modular system stand and a fully custom build are three different cost levels. Custom gives the most presence; modular lowers the cost per show when you exhibit repeatedly.

2. Height, structure and rigging

Tall walls, double-decker floors and suspended elements need engineering, approvals and more labour. Rigging is usually charged by the venue or organiser on top of the contractor’s quote.

3. AV, LED and lighting

Large LED walls are frequently the single biggest line after the structure. Decide what content you will actually show before committing to screen size.

4. Graphics, flooring and furniture

Printed and cut graphics, raised flooring, carpet or timber finishes, and furniture are all itemised. Hospitality furniture and branded counters add up quickly on larger stands.

5. Organiser and venue charges

Power, internet, water, approvals, performance deposits and sometimes mandatory services are billed by the organiser. Ask which of these are included in the quotation.

6. Lead time

Late briefs mean overtime and fewer supplier options. Briefing as soon as your space is confirmed is the single most effective way to control cost.

7. Logistics

For Saudi shows, transport distance and crew travel matter. For international exhibitors, shipping, customs and storage between shows should be in the budget from the start.

How to get a useful quotation

Share the event, hall and stand number, dimensions and open sides, the exhibitor manual, your objectives, and a budget range. Ask for an itemised quotation with options, such as custom versus modular for the same plot. It is the fastest route to a design you like at a number you can approve.

Sources

  1. Dubai stand cost and lead-time guide

Questions clients ask

How much does an exhibition stand cost in Dubai?

There is no single price, because cost follows the brief. The main drivers are floor area, stand type (shell scheme upgrade, modular or fully custom), height and structural complexity, rigging, AV and lighting, graphics, furniture, and the venue and organiser charges for power, approvals and deposits. Send us the event, stand size and orientation, and we will return an itemised quotation so you can see where the budget goes and where it can be reduced.

What affects the cost of an exhibition stand in Riyadh?

The same drivers as anywhere: floor area, stand type, height, rigging, AV, graphics and furniture. In Saudi Arabia, also allow for transport distance if elements are produced outside the city, organiser and venue service charges, and the lead time needed for approvals. We itemise every line so you can compare options such as custom versus modular.

How long does exhibition stand fabrication take?

It depends on size and finish. As a planning guide, allow time for design and revisions, then organiser approval of the drawings, then workshop production, then the build-up days the venue allocates. Larger double-deck or heavily customised stands need more lead time than modular systems. The safest approach is to brief your contractor as soon as your space is confirmed; late briefs are possible but reduce design options and raise cost.

Related articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Tell us about your next exhibition

Share the event, the stand size and your dates. We reply with questions if anything is unclear, then a costed proposal with 3D visuals.

PDF, image, Word or PowerPoint, up to 10 MB.

We reply within one working day. We use these details only to respond to your request. See our privacy policy.